North Geisum Field

The North Geisum Field is produced through Two platforms (WP-C & WP-D )

Platform-WP-C

Platform-WPC accommodates a total of nine wells, Five wells artificially lifted by (JP), One well artificially lifted by (ESP), Two wells shut-in because of high water cut, One well injector

Production Of Platform-WP-C

Production totals some 960 bopd, Average water cut of 89%, The average API gravity 27 degrees, Average GOR is 1500 scf/bbl.

Platform-WP-D

Platform-WPC accommodates a total of eight wells, Five wells artificially lifted by (ESP ), Two wells shut-in because of high water cut and low production rate, One well injector

Production Of Platform-WP-D

Production totals some 2150 bopd, Average water cut of 69%, The average API gravity 27 degrees, Average GOR is 200 scf/bbl. Theelectric power requirement of the WPD ESP installations is provided via a marine cable from the Geisum Star.