North Geisum Field

The North Geisum Field is produced through Two platforms (WP-C & WP-D )

Platform-WP-C

Platform-WPC accommodates a total of nine wells, Five wells artificially lifted by (JP), One well artificially lifted by (ESP), Two wells shut-in because of high water cut, One well injector

Production Of Platform-WP-C

Production totals some 960 bopd, Average water cut of 89%, The average API gravity 27 degrees, Average GOR is 1500 scf/bbl.

Platform-WP-D

Platform-WPC accommodates a total of eight wells, Five wells artificially lifted by (ESP ), Two wells shut-in because of high water cut and low production rate, One well injector

Production Of Platform-WP-D

Production totals some 2150 bopd, Average water cut of 69%, The average API gravity 27 degrees, Average GOR is 200 scf/bbl. Theelectric power requirement of the WPD ESP installations is provided via a marine cable from the Geisum Star.

Home        About Us         EServices        Contact US         Departments        Vacancies
All Rights Reserved To PetroGulf Misr@2011
Site Powered by ACS
The uk replica watches ceramic strap is generally resistant to rust and heat, although the hardness is relatively high, but the daily wear of the swiss replica watches should try to avoid the friction and impact with the excess or the same hardness of the special body. When dirt is worn on the replica watch for a long time, simply scrub the replica watches with a small toothbrush and soap.